A clear-span building gives industrial users a wide, column-free interior. That open floor lets plants fit longer production lines, move forklifts freely, install overhead cranes, and change layouts without working around columns. The steel frame is prefabricated, so erection on site can move faster than with cast-in-place concrete. Not every project needs one huge span, though. A multi-span steel workshop places selected columns inside the building and can suit very wide plants, so I compare both options below. I also cover design, cost, and supplier checks to help you judge which structure fits your facility and budget.
There are no beams inside the walls of a clear-span steel building. There is plenty of room for tools, racks, aisles, and workplaces. Outside columns often make it hard for tools to fit around them, and they block supervisors' views of the floor. You can make assembly lines that go in straight lines without them, which gives trucks and other automatic vehicles more room to turn. When setting up racks in warehouses, you don't have to work around posts; you can do it in straight lines. How much gain you get depends on how it's set up, so I start with the plan for the gear and then talk about range.
A new machine comes in, there are more than one item, or a process moves to a different bay. In a clear-span workshop, you don't have to cut around poles to move the floor. Because the bridge goes across the whole width and over the floor, overhead bridge cranes can also work in the open volume. Builders need to check the frame and supports early on because they depend on the crane's size and the runway's shape. This is something that is talked about in AISC Design Guide 7 on industrial buildings. I believe you should ask about the crane's size and job class in the first question.
Faster Construction and Easier Expansion
A pre-engineered steel building is made up of parts that have already been made and are put together according to plans. The purlins are put in place, and the main frames are bolted together by crews. The roof and walls are then added. Most of the time, bolts are used to put together DFX main frames because they are made of welded H-section steel in grades Q235 or Q355. The links are made of bolts, and the purlins are made of C/Z steel. It's also simpler to grow. When you build the end wall, keep the inside open in case you want to add rooms later. This needs to be planned during the design phase because it changes how the foundations and end walls are built.
Many people who buy things think that clear-span and multi-span are the same. They show how the roof's weight affects the base in real life. A multi-span steel workshop has several bays that are joined together, and columns are set up inside along the bay lines. There is still space between those lines for each bay to have a clear span. Long, open bays might be used for putting things together, while shorter bays could be used for storage or other tasks. The real question is where your business needs open floor space and where columns won't save you time or money.
Because the beams inside carry some of the roof weight, rafters can be shorter and lighter on a building that is very wide. That could make the steel lighter, but columns need to be set in concrete so they don't take up any floor space. There is no need for those columns when there is a single clear span. The rafters and connections need to be deeper and stronger. In every case, neither option is the best. This is based on the plan, the width, the loads, and the needs of the crane. If you need an industrial steel building, a good company should be able to price both types based on weight and plans. If your building is wide, you should ask for both.
Building frames made of pre-engineered steel are strong enough to hold one project's weight. Parts that are tapered put material where it will be most stressed, and tight tolerances are kept while the shop is built. Steel frames don't need to be left to cure like cast-in-place concrete does. The Metal Building Systems Manual is put out by the Metal Building Manufacturers Association. Architects in the US use it to plan this type of building. Concrete is still a good choice for some big jobs that need to be resistant to fire or blasts. Don't follow your normal routine when making your choice. Instead, think about what the job needs.
Workshops for making things should be in places with lots of empty space. In order to work, machine shops, assembly plants, and other processing plants need clear paths for materials and room to move lines around. A multi-span steel workshop is good for plants that need separate areas for welding, painting, and final assembly because columns can be put on the edges of each zone. A bridge crane serves each zone, and the column lines can also carry crane runways. DFX sells big steel buildings that are used in factories, assembly lines, and other places that work with tough materials.
In stores, where forklifts go and how racks are set up are important. You can set up your gear in the aisles and add high-bay racks without having to work around columns if the aisles are open. They don't take up much space on the floor because they can fall on rack lines in factories that are very wide. You need to plan ahead for the sprinklers, dock doors, and truck tracks because they affect where the doors go and how high the eaves are. I ask a client what kind of truck they have and what height racks they have before I tell them what bay width to use.
If you want the doors to be able to open all the way, and there to be a lot of empty space, you need a clear-span frame for garages that hold planes and trucks. Doors on farm equipment buildings need to be extra wide so that tractors and combine harvesters can fit through them. Some of the things that make heavy workshops more difficult to work in are noise, heat, dust, and rust from the cranes. The company Qingdao Director Steel Structure Co., Ltd. also builds steel structures for airplane hangars and processing plants. Let us know what kind of big machine or car you want to store. This tells us how high the door is and how high the clear height is.
It's not the steel that makes something good, but how it's made. I learn about the crane, its clear height, where the doors are, the routes for shipping and receiving, and how the equipment is set up. You can use those to figure out the roof's span, eave height, slope, drains, insulation, and airflow. ASCE 7 is used by the International Building Code. It tells you how much wind, snow, and earthquakes can damage your building. The footing plan comes from a geotechnical study. A licensed engineer in your state should look over the final drawings to make sure they follow local building codes. Until then, the early measurements should only be used as guides.
A price per square foot could be deceiving. Check the quote to see if it includes main frames, purlins, insulation, doors, crane beams, shipping, and help setting up the shed. How much steel costs and how much it weighs depend on its length, width, weight, load, need for corrosion protection, and fire safety needs. For big, open spaces, you need rafters that are deeper and links that are stronger. You need strong foundations for steel even if it's not very heavy. These foundations should be able to handle wind uplift, column reactions, and crane loads. You should also pay attention to condensation and insulation in places that are damp or used for work. Find out how much something costs and what it doesn't cover.
I need calculations for the structure, general arrangement drawings, connection details, material certificates, and steps on how to put it together. I also check the factory. Since it opened in 2011, more than 200 people have worked at Qingdao Director Steel in a 40,000-square-meter (about 430,000-square-foot) factory. Two lines are C/Z sections, and six lines are automatic H-beams. It can weld about 20,000 tons of H-beams and columns and 8,000 tons of C and Z sections every year. Production is done to ISO 9001 standards, and the steel frames are CE-approved. The materials meet the rules set by ASTM. As part of the service, the structure is planned, built, treated, packed, installation drawings are made, and advice is given on-site. It takes between 25 and 47 days to make each thing because they are made to order.
People who own businesses can get open floor plans, easy access for cranes, and quick frame assembly when they buy a clear-span steel building. On very wide plants, the rafter size can be decreased by adding internal beams to a multi-span steel workshop. They don't compete with each other because many buildings have both open bays and certain column lines. It depends on the tools, the loads on the crane, the width, the loads that are legal in the area, the soil's state, and the growth plans. You shouldn't just look at the price per square foot when you compare prices. You should look at the whole picture. This includes the frames, panels, doors, bases, and the installation. The span, height, and number of doors that a warehouse, hangar, factory, or big workshop needs vary. A clear goal and good engineering work are more important than a single spread number.
The floor is always open because the building's walls don't have any columns that face the outside.
Yes. The building is divided into bays by column lines, and each bay stays open between those lines.
The limit is based on the structure's weight, height, requirements for the type of crane, member size, shipping limits, and how it will be set up. It needs to be looked at by a tech for your place.
The rafters get lower as a building gets wider, which makes the steel weight go up. It's possible that the extra space and freedom to plan could make up for that cost. Look at all the lines before you decide.
Send the timeline, the size of the building, where it will be used, the door sizes, how much weight the crane and other tools can carry, and the width of the doors.
Are you putting up a hangar, plant, or both? DFX is a multi-span steel workshop maker in Qingdao that uses ISO 9001 quality systems, CE-certified steel buildings, and made-to-order production. Send your measurements, site location, loads, and plan to jason@bigdirector.com. We'll look at your layout and give you a quote and design that are perfect for the job.
1. Metal Building Manufacturers Association. Metal Building Systems Manual, 2018.
2. American Institute of Steel Construction. Specification for Structural Steel Buildings (ANSI/AISC 360-22), 2022.
3. American Society of Civil Engineers. Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE/SEI 7-22), 2022.
4. International Code Council. International Building Code, 2021.
5. American Welding Society. Structural Welding Code–Steel (AWS D1.1/D1.1M), 2020.
6. American Institute of Steel Construction. Design Guide 7: Industrial Buildings—Roofs to Anchor Rods, 2nd Edition, 2004.
Learn about our latest products and discounts through SMS or email